CASE STUDY
On-site Inspection & Commissioning — Vietnamese Project
Date: 2022
Location: Vietnamese
2022 High Voltage Reactive Compensation Device & APF Successfully Installed& Commissioned in Vietnam
In 2022, the following reactive power compensation devices had been successfully installed and commissioned on-site at the designated location in Vietnam. And then, in 2023, it began to be used in the substation.